Shipping and installation
From our workshop to your running plant: packing, export documents, sea freight, installation and commissioning.
Packing
Machines are cleaned, protected against corrosion, and packed in seaworthy crates or containers, with a packing list matched to crate numbers.
Documents
Commercial invoice, packing list, bill of lading and certificate of origin as standard, plus any pre-shipment inspection your country requires.
Typical sea transit from India
| Destination | Typical transit |
|---|---|
| Mombasa (Kenya) | about 18–25 days |
| Dar es Salaam (Tanzania) | about 20–28 days |
| Durban (South Africa) | about 18–25 days |
| Tema (Ghana) | about 28–38 days |
| Lagos (Nigeria) | about 30–40 days |
| Uganda, Rwanda, Zambia (via corridor ports) | about 30–45 days door to door |
Transit times vary by shipping line and season.
Your side
Building ready with flooring and foundations per our drawings, power supply and panels, water, and customs clearance through your agent.
Installation and commissioning
Our engineers travel to your site, supervise placement, connect and align machines, run dry trials, then run production trials with your raw materials and train your team. Typical on-site time is 2 to 6 weeks depending on plant size.