How we work
Six stages, each with a clear deliverable and a payment milestone.
1. Brief
You tell us the product, target output, country, site and budget. Photos or a drawing of your building help.
You get: a call with an engineer within 2 working days.
2. Design
We prepare a layout for your building, a machine list, utility requirements (power, water, compressed air), a formula plan and an indicative price.
You get: layout drawing, machine list, techno-commercial offer.
3. Contract
Scope, specifications, delivery dates, payment milestones, warranty and protections are written into a signed contract. See contract protections.
4. Build
Machines are fabricated in our workshop. Each machine is trial-run before dispatch, and you get video of the trials. You are welcome to inspect in person or send an inspector.
5. Ship and install
We pack for sea freight, handle export documents and ship to your port. Our engineers install, commission, run trial batches with your raw materials and train your operators. They stay until the plant runs at rated output. See shipping and installation.
6. Supply and support
Raw materials ship on a monthly schedule, and spares and remote support continue for the life of the plant. See after-sales.