Skip to content
Pass Industries

Factories for Africa, built and supplied from India.

We design, fabricate, install and commission complete soap and detergent plants for manufacturers across Africa, then ship the raw materials they run on every month.

  • Registered Indian company
  • LC and bank guarantee accepted
  • Live video tour of our works
  • Plant contracts in Africa
  • Plants installed in India
  • Head office and works, West Bengal

Nigeria

Plant contract

Uganda

Plant contract

Rwanda

Plant contract

South Africa

Plant contract

India

Durgapur, Bangalore and more

A machine exporter ships a crate. We hand over a running factory.

Most first-time manufacturers in Africa buy machines from one supplier, hire installers from another and chase raw materials from a third. When something breaks, nobody owns it. Pass owns all of it.

Machines we make ourselves

Every machine is designed and fabricated in our own workshop, so a complete line costs far less than an imported one, and spares are never a mystery.

Engineers on your site

The team that designs your plant installs it, trains your operators and stays until the first good batch comes off the line.

Inputs on a schedule

Raw materials arrive by container on a supply contract matched to your output, from the people who know your process.

Plants we build

Turnkey lines sized to your market, from a first starter plant to full-scale production.

Discuss your capacity
SilosSlurry mixerReactorDrying towerPacker
Schematic. Final layout is drawn to your site, product mix and power supply.

Detergent powder plant

From raw-material handling to packed product: mixing, reaction, drying and packing. The fastest route into the largest household category.

Output
1 to 10 tons a day
Floor area
600 to 1,500 m²
Order to commissioning
4 to 6 months
Supply contract
Included
  • Process design and plant layout
  • All machines, built and tested before shipping
  • Installation, training and trial production on site
Request a detergent plant quote

From your first call to the hundredth container

Six stages, one team, and one contract that names every one of them.

  1. 1

    Consult

    Your product, market, site and budget. We tell you plainly what will work.

  2. 2

    Design and quote

    Layout, machine list, utilities and a fixed, itemised price.

  3. 3

    Fabricate

    Machines built and run-tested in our workshop before they leave India.

  4. 4

    Ship and install

    Export paperwork, freight and installation by our own engineers.

  5. 5

    Train and commission

    Your operators run trial production with us beside them.

  6. 6

    Supply, every month

    Raw materials by container, so the line never stops for inputs.

Your plant never waits for raw materials.

Every Pass plant can come with a supply contract. We ship the chemicals and consumables your line runs on, by the container, on a schedule set by your production plan.

  • Sodium percarbonate

    Oxygen bleach for detergent powder. Supplying now.

  • Sodium bicarbonate

    Detergent and soap input. Coming to our supply range.

  • Spares and consumables

    Wear parts, dies and packing material for your line.

Set up a supply contract
PASS 20 ft · Kolkata to Lagos Supply contract Monthly

Buying machines is not the same as buying a factory

What you get with a Pass plant, next to importing a line on your own.

What you get Pass plant Imported machines
Plant designed for your site and productStandard catalogue line
Installation by the maker's engineersYou hire installers
Operator training on your siteManual and video
Commissioning to first good batchRarely included
Raw-material supply contractFind your own suppliers
One party accountable after handoverWarranty on parts only

Contracts that protect both sides

Milestone payments

An advance on signing, the balance released against shipment and commissioning.

Bank-backed

Letters of credit and bank guarantees through your own bank.

Itemised scope

Every machine, service and deliverable named before any steel is cut.

Export handled

Customs documents, freight and export credit cover arranged from India where available.

Plants on two continents

Ask any of them about us. We will put you on a call.

See it running before you buy

Visit our works in West Bengal. Watch production lines run, meet the engineers, and leave with a first plan for your own plant.

Book a visit

Green Sheep

We run the plants we sell

Our Green Sheep detergent and soaps are made on Pass equipment and sold to institutions across West Bengal. Every process we install, we have run on our own money first.

Green Sheep is a consumer brand of Pass Industries.

Common questions

Which countries do you work in?

We have plant contracts in Nigeria, Uganda, Rwanda and South Africa, and plants running in India including Durgapur and Bangalore. We take projects wherever our machines can ship and our engineers can travel.

What does a turnkey plant include?

Process design, every machine, shipping, installation on your site, operator training, and commissioning through trial production. The exact scope is itemised in your contract.

How do payments work?

An advance on signing, with the balance secured by a letter of credit or bank guarantee and released against shipment and commissioning.

Do you supply raw materials after installation?

Yes. We ship inputs such as sodium percarbonate by container on a supply contract sized to your production.

Can I see a working plant first?

Yes. Visit our works in West Bengal and watch our own lines run. We can also arrange a call with an existing client.

One team, from drawing board to daily supply

Design, fabrication and our own production sit under one roof in West Bengal, India. Every project gets a named lead from each team below, in writing, before you sign.

Projects and contracts

Your single point of contact from first call to handover. Scope, pricing, payment terms and site visits.

Engineering

Plant design, machine fabrication, installation and commissioning. The people who travel to your site.

Supply and logistics

Raw materials, spares, export documents and container schedules after your plant is running.

Buyer support

Answers enquiries, arranges video walkthroughs and reference calls, and keeps you updated at each milestone.

Check us before you pay anything

Buying a plant from another country is a serious commitment. You should not have to take our word for anything. Every detail below can be checked independently with the Government of India.

Registered company
Corporate Identity Number [CIN]. Check on the Ministry of Corporate Affairs portal.
mca.gov.in
Licensed exporter
Importer Exporter Code [IEC]. Check on the Directorate General of Foreign Trade portal.
dgft.gov.in
Tax registered
GSTIN [number]. Check on the Goods and Services Tax portal.
gst.gov.in
See the works live
Ask for a live video walkthrough of our workshop and running lines, at a time that suits you.
Book a video call
Speak to a client
We connect serious buyers with an existing plant owner before any contract is signed.
Request a reference

Protect yourself from fraud. Pass Industries only accepts payment into a bank account in the company's registered name, stated in your signed contract. We never ask you to pay a personal account, and we never change bank details by email or WhatsApp. If anyone does, stop and call us on the number on this website.

Tell us what you want to make

An engineer, not a sales desk, replies with a first plant outline, machine list and budget range.

Target output

We reply within 2 working days. We never share your details.